TunnelArt

EasyMed
4 September 2020
Tunnel solutions are indicated in cases of minimum investment by the client who wants to cover crops where the internal volume is to be maximized while rationalizing the structure.

Caratteristiche Tecniche

  • SENDZMIR Z275 or H.D.G. steel structure
  • Anchoring without cement by means of ground anchors or feet to be cemented
  • Cover in single or double plastic sheeting
  • Manual or motorized roller shutter side openings
  • Rolling, tilting or rigid header openings
  • Sliding doors with 1 or 2 wings
  • Steel bolts 8.8 H.D.G.

TunnelArt

TunnelArt

Hot Zone Solution

Designed to meet the needs of hot climate zones, it has excellent ventilation performance. Its main features are the greater space along the perimeter and the large volume offered
MEASURES
L (mm) 6000 nosepiece - 8000 nosepiece - 9600 nosepiece 8000 simple - 9300 simple
H useful to the tie rod (m) From 2.10 to 2.70
Arch spacing (m) 1,00 – 1,50 – 2,00 – 2,50
Bows and tie rods Bows: Ø 42/60 x 1,5/2,0mm - Tie rods: Ø 27/32 x 1,5mm

TunnelArt's Photos